Under a contract with Amir Kabir Petrochemical Complex in 2019, our company established a gas pressure reduction station with a daily offloading capacity of 400 tons, featuring three parallel gas offloading lines (total daily capacity: 400 tons) on-site at the complex. Through this infrastructure, we have delivered over 205,000 tons of ethane gas to Amir Kabir Petrochemical Complex by the end of 2024.